Remediation by replacement borings
Demolition of the former ZV tank farm with expansion of fuel tanks and renovation through soil replacement. Disposal of the building fabric and the excavated soil. Dewatering with water purification.
For the HIM ASG, the BRE BMU division is carrying out a soil stabilization measure on the site of the former Butzbach cable recycling company in the Butzbach-Ebersgöns district, Am Heinrichsberg.
Demolition, soil remediation, earthwork and sheeting work